Pilot readiness
Send the paid pilot scope and schedule the baseline replay kickoff.
First-call RouteOps qualification: score the account, price the paid pilot, name the missing data, and show the exact proof artifact that would become a customer case study.
Start with the sample RouteOps account, edit the numbers, and get the next buyer action without decoding solver language.
Preview the exact route-file shape Catalyst-Q needs for week one: orders, vehicles, time windows, capacity, and driver-hour constraints.
Send the paid pilot scope and schedule the baseline replay kickoff.
Fuel, labor, and mileage exposure from the sample ICP.
One freight or field-routing lane, one historical baseline replay, one shadow-mode route decision cycle, and one finance-ready closeout packet.
The first screen should ask for only the fields that prove ICP fit and willingness to pay.
Ready now means the account can move to a paid pilot without pretending third-party connectors are live.
A repeatable onboarding path makes this look fundable instead of services-heavy.
Upload the route file and baseline export.
Validate inputs, quantify exposure, and build the first proof packet.
Approve cost assumptions and route constraints.
Run dispatcher, heuristic, open-solver, and Catalyst-Q comparison rows.
Review shadow-mode recommendations and approve only bounded decisions.
Track accepted, rejected, and pending recommendations.
Confirm verified savings and expansion criteria.
Build CFO ROI packet and conversion recommendation.
The page makes the next investor diligence question visible: can this convert into paid pilots?
Shows whether a buyer can move from interest to paid scope.
VCs fund repeatable onboarding, not bespoke consulting.
Confirms the product can produce the artifact the buyer is paying for.
Avoids diligence failure from integration overclaims.
pending_customer_evidence
Use this payload in CRM, investor diligence, or a buyer qualification flow.
{
"ok": true,
"pilot_room": {
"id": "catalyst-q-pilot-conversion-room-v1",
"vertical_id": "freight-field-routing",
"updated_at": "2026-05-31",
"positioning": {
"category": "RouteOps paid pilot conversion layer",
"buyer_promise": "Know if a paid pilot is worth it before asking a buyer to trust another AI demo.",
"claim_boundary": "Catalyst-Q is not a TMS replacement. It does not operate vehicles, change routes without approval, or promise fixed savings; it is a paid-pilot proof layer for route decisions with human approval."
},
"qualification": {
"required_inputs": [
{
"id": "fleet_size",
"label": "Fleet size",
"why_it_matters": "Screens for route volume and operational stakes."
},
{
"id": "weekly_routes",
"label": "Weekly routes",
"why_it_matters": "Shows whether repeated decisions justify a paid pilot."
},
{
"id": "annual_route_miles",
"label": "Annual route miles",
"why_it_matters": "Creates the mileage and fuel exposure baseline."
},
{
"id": "fuel_spend_usd",
"label": "Annual fuel spend",
"why_it_matters": "Quantifies one finance-owned savings lever."
},
{
"id": "labor_spend_usd",
"label": "Annual route labor spend",
"why_it_matters": "Quantifies dispatcher and driver time exposure."
},
{
"id": "current_tms",
"label": "Current TMS or route tool",
"why_it_matters": "Keeps Catalyst-Q positioned as a proof layer around existing systems."
},
{
"id": "pain_metric",
"label": "Pain metric",
"why_it_matters": "Forces the pilot to prove a buyer-owned problem."
},
{
"id": "decision_owner",
"label": "Decision owner",
"why_it_matters": "Identifies who can approve the pilot and sign off on value."
},
{
"id": "can_upload_route_file",
"label": "Route file ready",
"why_it_matters": "Enables first value in the first week."
},
{
"id": "has_dispatcher_baseline",
"label": "Dispatcher baseline",
"why_it_matters": "Gives the proof packet a real opposing row."
}
],
"scoring_model": [
"High route volume and fleet size raise readiness.",
"Annual fuel, labor, and mileage exposure must support the paid-pilot price point.",
"A route file, dispatcher baseline, pain metric, and decision owner are required for ready_now.",
"TMS replacement intent lowers fit because Catalyst-Q is a decision-proof layer."
]
},
"sample_qualification": {
"ready_state": "ready_now",
"pilot_readiness_score": 100,
"economic_exposure": {
"annual_route_cost_usd": 1836000,
"annual_route_miles": 1200000,
"fuel_spend_usd": 680000,
"labor_spend_usd": 940000
},
"missing_data": [],
"disqualifiers": [],
"next_best_action": "Send the paid pilot scope and schedule the baseline replay kickoff.",
"recommended_offer": {
"price": "$15,000-$35,000 for 4-6 weeks",
"scope": "One freight or field-routing lane, one historical baseline replay, one shadow-mode route decision cycle, and one finance-ready closeout packet.",
"success_metric": "Verified change in mileage, lateness, capacity violations, fuel/emissions proxy, and accepted recommendations versus the dispatcher baseline.",
"required_data": [
"One route file with orders, stops, vehicles, time windows, capacity, and service times.",
"Dispatcher baseline or current TMS export for the same route set.",
"Fuel, labor, lateness, service-failure, or route-change cost assumptions approved by finance.",
"Decision owner, dispatcher owner, and rollback owner."
],
"deliverables": [
"Pilot readiness score and ICP decision.",
"Route Decision Record for each approved candidate.",
"Hostile solver review against dispatcher, heuristic, OR-Tools, PyVRP, and VROOM rows where available.",
"CFO ROI packet with accepted, rejected, and pending recommendations.",
"Case-study skeleton ready for customer approval once verified savings are observed."
],
"acceptance_gates": [
"CFO or finance reviewer accepts the cost-exposure model.",
"Dispatcher approves the first Route Decision Record before operational change.",
"Catalyst-Q must beat, match, or explain the baseline before rollout expansion.",
"Third-party connectors remain planned or pilot-scoped until credentials, mapping, and validation are complete."
],
"connector_posture": "CSV intake is live today. TMS/API/webhook/telematics connectors are pilot-scoped and require tenant approval, credentials, mapping, and validation.",
"timeline": [
{
"week": "Week 1",
"buyer_action": "Upload the route file and baseline export.",
"catalyst_action": "Validate inputs, quantify exposure, and build the first proof packet.",
"output": "Pilot readiness score and data-gap list."
},
{
"week": "Week 2",
"buyer_action": "Approve cost assumptions and route constraints.",
"catalyst_action": "Run dispatcher, heuristic, open-solver, and Catalyst-Q comparison rows.",
"output": "Route Decision Record with hostile review."
},
{
"week": "Weeks 3-4",
"buyer_action": "Review shadow-mode recommendations and approve only bounded decisions.",
"catalyst_action": "Track accepted, rejected, and pending recommendations.",
"output": "Adoption and risk-delta evidence."
},
{
"week": "Weeks 5-6",
"buyer_action": "Confirm verified savings and expansion criteria.",
"catalyst_action": "Build CFO ROI packet and conversion recommendation.",
"output": "Paid-pilot closeout and customer-approved case-study draft."
}
]
}
},
"paid_pilot_offer": {
"price": "$15,000-$35,000 for 4-6 weeks",
"scope": "One freight or field-routing lane, one historical baseline replay, one shadow-mode route decision cycle, and one finance-ready closeout packet.",
"success_metric": "Verified change in mileage, lateness, capacity violations, fuel/emissions proxy, and accepted recommendations versus the dispatcher baseline.",
"required_data": [
"One route file with orders, stops, vehicles, time windows, capacity, and service times.",
"Dispatcher baseline or current TMS export for the same route set.",
"Fuel, labor, lateness, service-failure, or route-change cost assumptions approved by finance.",
"Decision owner, dispatcher owner, and rollback owner."
],
"deliverables": [
"Pilot readiness score and ICP decision.",
"Route Decision Record for each approved candidate.",
"Hostile solver review against dispatcher, heuristic, OR-Tools, PyVRP, and VROOM rows where available.",
"CFO ROI packet with accepted, rejected, and pending recommendations.",
"Case-study skeleton ready for customer approval once verified savings are observed."
],
"acceptance_gates": [
"CFO or finance reviewer accepts the cost-exposure model.",
"Dispatcher approves the first Route Decision Record before operational change.",
"Catalyst-Q must beat, match, or explain the baseline before rollout expansion.",
"Third-party connectors remain planned or pilot-scoped until credentials, mapping, and validation are complete."
],
"connector_posture": "CSV intake is live today. TMS/API/webhook/telematics connectors are pilot-scoped and require tenant approval, credentials, mapping, and validation.",
"timeline": [
{
"week": "Week 1",
"buyer_action": "Upload the route file and baseline export.",
"catalyst_action": "Validate inputs, quantify exposure, and build the first proof packet.",
"output": "Pilot readiness score and data-gap list."
},
{
"week": "Week 2",
"buyer_action": "Approve cost assumptions and route constraints.",
"catalyst_action": "Run dispatcher, heuristic, open-solver, and Catalyst-Q comparison rows.",
"output": "Route Decision Record with hostile review."
},
{
"week": "Weeks 3-4",
"buyer_action": "Review shadow-mode recommendations and approve only bounded decisions.",
"catalyst_action": "Track accepted, rejected, and pending recommendations.",
"output": "Adoption and risk-delta evidence."
},
{
"week": "Weeks 5-6",
"buyer_action": "Confirm verified savings and expansion criteria.",
"catalyst_action": "Build CFO ROI packet and conversion recommendation.",
"output": "Paid-pilot closeout and customer-approved case-study draft."
}
]
},
"case_study_skeleton": {
"status": "pending_customer_evidence",
"title": "Freight RouteOps paid pilot case study",
"fields": {
"baseline": "Current dispatcher or TMS plan, with mileage, lateness, capacity, fuel, and route-change metrics.",
"catalyst_candidate": "Catalyst-Q candidate from freight-routeops-proof-packet-v1, compared against dispatcher, heuristic, OR-Tools, PyVRP, and VROOM where available.",
"accepted_decision": "Human-approved Route Decision Record with rollback plan and signature.",
"verified_savings": "Finance-approved savings, avoided cost, or risk reduction after shadow-mode or controlled rollout.",
"objections": "Connector readiness, data quality, dispatcher trust, solver-comparison gaps, and rollout risk.",
"conversion_outcome": "Paid pilot converted, extended, paused, or rejected with reason codes."
}
},
"vc_metrics": {
"funding_verdict": "seed_watchlist",
"fundable_when": [
"3 paid pilots with signed Route Decision Records.",
"At least one customer-approved ROI packet or case study.",
"Repeatable first-week onboarding from route file to proof packet.",
"Clear connector posture that does not overclaim production integrations."
],
"metrics": [
{
"id": "paid_pilot_readiness_score",
"label": "Sample paid-pilot readiness",
"value": 100,
"unit": "score",
"why_it_matters": "Shows whether a buyer can move from interest to paid scope."
},
{
"id": "time_to_first_value_days",
"label": "Time to first proof packet",
"value": 7,
"unit": "days",
"why_it_matters": "VCs fund repeatable onboarding, not bespoke consulting."
},
{
"id": "proof_packet_completeness_pct",
"label": "Proof packet completeness",
"value": 100,
"unit": "percent",
"why_it_matters": "Confirms the product can produce the artifact the buyer is paying for."
},
{
"id": "connector_honesty_score",
"label": "Connector honesty",
"value": 9,
"unit": "of 9 connectors accurately scoped",
"why_it_matters": "Avoids diligence failure from integration overclaims."
}
]
},
"links": {
"page": "https://catalyst-q.strategic-innovations.ai/pilot-room",
"qualify_api": "https://catalyst-q.strategic-innovations.ai/v1/pilot-room/qualify",
"routeops_proof_room": "https://catalyst-q.strategic-innovations.ai/routeops-proof-room",
"freight_proof_packet": "https://catalyst-q.strategic-innovations.ai/v1/freight/proof-packet",
"pricing": "https://catalyst-q.strategic-innovations.ai/pricing"
}
}
}